The isolation plan says the plant can be cut off. Here is how to test that the cut worked.
CI Fortify asks operators to test their isolation plans. A test matrix for an isolation drill: the paths to try before and after each step, from which machines, and what to record.
An isolation plan describes how to cut the plant network off from every other network when the threat is high enough. Most plans are a list of firewall changes, in order, with an owner for each. Few plans say how to check that each change did what it was meant to do. CI Fortify isolation testing is that check, and this post gives a method for it.
The method is a drill. You write down the connections each step is meant to stop, try them before the step, apply the step, and try them again.
What the guidance asks you to test
The Australian Signals Directorate published CI Fortify's advice for isolating vital systems on 28 July 2026, with partner agencies in the United States, the United Kingdom and Canada. An earlier CI Fortify publication, from October 2025, sets the goal: an operator should be able to isolate its vital systems for three months and keep its critical service running.
Three parts of the July advice are about testing.
- Test the plan periodically. ASD recommends testing the isolation of all vital systems. Testing one system, or a few, can miss the dependencies between them.
- Test reachability while isolated. Run regular tests between the critical and non-critical networks for as long as the isolation lasts.
- Alert when a control fails. Staff should be told when a test shows that an isolation control is ineffective or has been removed.
The advice also describes a graduated plan, in which paths into the vital systems are closed in steps as the threat rises. The drill below follows those steps.
The example network
The examples in this post use one network. It is a water utility with an office network, a server network and a control network at a treatment plant. A firewall sits between the control network and the other two. Remote staff reach the control network through a jump host on the server network. A historian server on the server network reads from the controllers.
Its isolation plan has three steps.
- Disable remote access through the jump host.
- Stop the historian and every other server from reaching the control network.
- Isolate the control network from all other networks.
Your plan will differ. The method is the same.
Step 1: write the test matrix
A test matrix is a table with one row for each connection you will try. Each row names a source machine, a target address, a port, and the result you expect before and after a step of the plan.
| Row | Plan step | Source | Target | Port | Expected before | Expected after |
|---|---|---|---|---|---|---|
| 1 | Always | Office PC, office network | PLC-PUMP1, 10.60.1.11 | 502 | Blocked | Blocked |
| 2 | Always | Office PC, office network | ENG-WS01, 10.60.1.50 | 3389 | Blocked | Blocked |
| 3 | 1 | JUMP01, server network | ENG-WS01, 10.60.1.50 | 3389 | Open | Blocked |
| 4 | 2 | HIST01, server network | PLC-PUMP1, 10.60.1.11 | 44818 | Open | Blocked |
| 5 | 2 | APP02, server network | PLC-PUMP1, 10.60.1.11 | 502 | Blocked | Blocked |
| 6 | 3 | ENG-WS01, control network | DNS01, 10.20.0.53 | 53 | Open | Blocked |
Rows 1, 2 and 5 are paths that should be blocked on an ordinary day. Keep them in the matrix. A drill is a good day to find one open.
Rows 3 and 4 are paths the plan closes. They must be open before the step and blocked after it.
Row 6 runs in the other direction, from the control network to the office side. The guidance asks for tests both ways. It also lists the services that plants often share with the office: identity, DNS, DHCP, time, backups, storage, virtualisation and certificates. Add a row for each shared service your control network uses. If the control network stops working when one of them is cut off, you want to learn that in a drill.
Write a row for every vital system. A matrix with rows for one pump station tells you about one pump station.
Step 2: agree the drill with the plant's owner
Give the control network's owner the matrix before the drill. It lists every source machine, target address and port. Agree the time, and agree who will stop the drill if production is affected.
Rows that start inside the control network, such as row 6, belong to the control engineers. They decide which machine to test from and whether to test at all. Do not install anything on control equipment for a drill.
Step 3: run the baseline
Before any step of the plan, try every row and write down the result. For each row, sit at the source machine and attempt one connection to the target address and port.
Test-NetConnection 10.60.1.11 -Port 502
nc -vz -w 5 10.60.1.11 502
Attempt one connection to one named address and one named port. Do not sweep the control network to see what answers. The by-hand method, with more detail on each command, is in how to test network segmentation.
A baseline that differs from the "expected before" column is a finding. Fix it or record it before you continue. Otherwise you cannot tell which results the drill caused.
Step 4: apply one step, then test again
Apply step 1 of the plan. Wait until the firewall team says the change is deployed. Then try every row again, not only the rows for step 1. A change meant to close one path can open or close another.
Repeat for each step. After the last step, every row should read "Blocked".
Test from each source machine in the matrix. A report from the firewall manager says the change was pushed. A connection attempt from HIST01 says whether HIST01 can still reach the controller.
The guidance also asks operators to inspect routing tables for routes that still join the two sides. Do that at each step, next to the connection tests.
Step 5: record every result
Keep one record for each attempt.
| Field | Example |
|---|---|
| Row and plan step | Row 4, step 2 |
| Source | HIST01, server network, 10.30.0.21 |
| Target and port | PLC-PUMP1, 10.60.1.11, port 44818 |
| Expected | Blocked |
| Result | Connection opened |
| When | 24 November 2026, 10:16 |
| Who | The tester, and the control engineer who agreed the drill |
A result that differs from the expected one goes to the plan's owner the same day. In this example, step 2 missed one firewall rule for the historian. The plan needs that rule added before the next drill.
Step 6: restore, and test once more
Reverse the steps in order. Then try every row again and compare the results with the baseline. Rows 3, 4 and 6 should be open again, and rows 1, 2 and 5 should still be blocked.
This last pass matters as much as the others. A restore done in a hurry is how a temporary rule from the drill stays in place for months.
What the drill leaves open
A drill describes one day. Firewall rules change between drills: a firewall rule opened for testing and never reverted, a new site whose rules were copied from an old site, a migration that widened an object group. The plan in the folder still reads correctly after each of these changes. Nobody knows whether rows 1, 2 and 5 are still blocked until the next drill.
Segproof does this part for the rows that start on the office and server side. You declare each row as a policy. An agent on the source machine attempts only the connections you declare, as often as every 5 minutes on the paid plan, and never tries an address range. Nothing is installed on the control network. When a blocked path opens, the alert arrives within 7 minutes on a 5-minute policy, with the agent, the address and the port.
During a drill, the same policies replace the walk from desk to desk. Apply the step, select Test now, and the results from every agent arrive within 2 minutes. Each result is kept with its time, and the audit log records who asked for the test. The page for plants and utilities shows a drill recorded this way, and the starter policies and the control map list the paths and the frameworks.